Monday 13th we built the first big wall for the first floor.
Tuesday 14th we put up the first big wall and braced it off for the night.
Wednesday 15th we put up the rest of the first floor walls and braced them to be ready for the roof trusses that were to be sent to us Friday.
Friday 17th we cleaned up the job site before snow fall. Doing so we stacked/organized all the wood beneath the first floor in the back of the garage of the house while the roof trusses were set upside down 0n the first floor braced to be ready to sit all break.