Lately I've been trying to get some of the rough wiring done, but this is another one of those jobs where I can't do the main task-at-hand until I finish another seemingly non-related task.
I'm planning on putting ceramic or porcelain tile throughout the house. One of the prerequisites for laying tile is a strong, stiff floor. If the floor flexes, the grout between the tiles can crack. In order to help stiffen the floor, I'm reinforcing all the floor joists by screwing and gluing a 12" wide piece of 1/2" plywood to one side of each joist. (When renovating existing homes, sagging floors are often fixed by installing new joists directly beside existing joists. That's called "sistering the joists".)
Since a lot of the wiring will run through the floor joists, I need to get the joist reinforcement done before I can run any wiring. Once the joist reinforcement is done, I'm able to drill some holes and run my wire through the joists.
No comments:
Post a Comment