Sunday, November 8, 2009

Electrical Service Panel

I've got my electrical panel installed now. The electrical code says that the electrical panel must be installed "as close as practicable" to the service entrance (i.e. meter base on the outside), so I've installed the electrical panel just on the other side of the wall from the meter base.

I've used 2" PVC conduit to go down from the meter base and through the wall to the electrical panel. There are three 2/0 gauge wires that run through the conduit. The wire is very stiff and difficult to work with, and it took me an hour of pushing and pulling and cursing to get the three wires through the conduit.



The center wire (white tape) is the neutral wire and the other two are the "hot" wires.





Oh yes... there is no power on any of this yet. I wouldn't be doing any of this if there were. Once I have everything installed the electrical inspector will have a look at it, and if he approves it then the power company will come and install my electrical meter and hook me up to the grid.