Last week (10/12 to 10/14) we finished the following steps in making the footings.
-The site was cleared.
-D1 gravel: We had a gravel pad made on the lot by Admiralty Construction.
-Stone retaining wall: There is a large stone retaining wall that was assembled by Admiralty Construction.
-Excavation: Once again, this was made possible by Admiralty Construction.
-Survey lines : Our class made the survey lines. We squared the corners using the Pythagorean Theorem, then checked for squarness by measuring diagonals.
We would like to extend a big thanks to Admiralty Construction, they did a great job doing the groundwork for the site.